Author Archives: admin

Going Great on the Great Central

D5310 made a successful debut at the Great Central Railway Diesel Gala on 18th and 19th May, joining Class 25 D7612 visting from the South Devon Railway and resident Class 27 D5401 to provide a superb trio of Sulzer Type 2s as part … Continue reading

Posted in Uncategorized | Leave a comment

GCR Diesel Gala Timetable

A big thank you to those who supported D5310′s running day last weekend. All went well and the adjustments made to the electric radiator fan thermostat appear to have been successful with the fan cutting in as expected. D5310 is … Continue reading

Posted in Uncategorized | Leave a comment

D5310 – Great Central Railway

We are delighted to announce that Class 26 D5310 will be joining D7612 and D5401 to give an impressive Sulzer Type 2 trio at the GCR’s Diesel Gala on May 18th/19th. The 26 will work a 4 trip running day … Continue reading

Posted in Uncategorized | Leave a comment

May 4th Running Day

With the incredible (and frustrating) March snow now (hopefully) a fading memory and the Llangollen Railway very much back in business, we are looking forward to our first running day of the year after the disappointment of having to cancel our Spring … Continue reading

Posted in Uncategorized | Leave a comment

Spring in Denbighshire?

The cancellation of yesterdays Diesel Day was a very bitter pill to swallow but was clearly a very sensible decision as the heaviest snowfall in around 30 years hit the Dee Valley through Friday and Saturday, making many roads impassable and causing power … Continue reading

Posted in Uncategorized | Leave a comment

IMPORTANT – DIESEL DAY CANCELLED

We are very sorry to announce that the Saturday 23rd March Diesel Day has been cancelled due to the severe adverse weather conditions in Llangollen and the surrounding area. The local roads are largely impassable and, with more snow forecast for … Continue reading

Posted in Uncategorized | Leave a comment

Snow Joke

We are all acutely aware of the snow forecast for tomorrow: http://www.bbc.co.uk/weather/2644021 Whilst there are currently no plans to cancel the event, we will have to review how things go. As well as challenges with the locomotives and infrastructure caused by heavy snow, we … Continue reading

Posted in Uncategorized | Leave a comment

Carry on to Carrog!

The Llangollen railway successfully reopened to Carrog last weekend as planned. The full B timetable and loco roster is now confirmed as follows: D5310 is on the 10:00, 12:00, 14:00 and 16:00 trains from Llan, working back from Carrog at 11:00, 13:00, 15:00 … Continue reading

Posted in Uncategorized | Leave a comment

6940 Back in Beastly Business

‎6940′s leaking air pipe has now been repaired and was refitted yesterday. The location of the pipe in question can be seen in the photo below – under the cab doorway. The linkage you can see with the chain attached connects the handbrake wheel … Continue reading

Posted in Uncategorized | Leave a comment

Reinstatement of Services to Carrog

We are very pleased to announce the wonderful news that the Llangollen Railway is planning to be reinstate passenger services through to Carrog commencing Saturday 16th March 2013. As a result, we hope to work trains through to Carrog on our 23rd March … Continue reading

Posted in Uncategorized | Leave a comment